[ChangeLanguage]
Sidebar content Main content
Actions
  • Titre
    Pilot ERTMS project on course
  • Numéro d'objet
    BIB_K39449
  • Source
    Railway Gazette International (01 03 2006), p.143
  • Dimensions
    K
  • Matériau
    ARTICLE
Résumé


The Cordoba-Malaga high speed line will be equipped to operate with ETCS Levels 1 and 2. Contractor for the train control system is Dimetronic Signals (sister company of Westinghouse Rail Systems).


The Cordoba-Malaga high speed line will be equipped to operate with ETCS Levels 1 and 2. Contractor for the train control system is Dimetronic Signals (sister company of Westinghouse Rail Systems).